WebMail










Colombia

Onshore Colombia
Middle Magdalena Basin - Rosa Blanca

On September 20, 2006, the Company applied for an exploration Licence covering 45,000 Ha of acreage in the upper part of the Middle Magdalena Basin. The block, known as Rosa Blanca, is surrounded by the nearby oil producing fields of Cristalina, Santa Lucia, Tisquirania, Totumal, Baturama and the South Bolivar Block.

The petroleum system within the Rosa Blanca Block has been proved in nearby oil wells and fields which reduces the geological risk significantly.  The Company believes that the presence of the fractured reservoir zones within the reservoir rock is the main operational risk.

The Company has entered into an agreement with Montecz S.A a Colombian service company which specializes in pipeline and tank construction and has a number of minority participations in E&P contracts in the Colombia. The agreement specifies that Gold and its partner Empesa will be carried for one well (plus testing) in the third exploration period.  Montecz earns a 72%interest, Gold retains a 25% interest and Empesa 3% interest in the Rosa Blanca block.  Once Montecz has completed the process of establishing the mandatory escrow account with the ANH, it is intended that Gold and Montecz will enter into a joint operating agreement.

The E&P contract entered into its third phase of exploration, as a result of the evaluation and interpretation of 62 km. of 2D seismic lines acquired late in 2009.   The environmental licence for the block is already approved and the specific environmental approvals for the drilling of the well RB-2 are in the course of being prepared. The drilling schedule contemplates operations to commence by August / September 2010, with the well testing contemplated in October

 


Project Type: Exploration
Partners:

  1. Montecz (72%)
  2. Gold Oil (25.2%)
  3. Empesa (2.8%)

Future Obligatory Commitments:

PERIOD
WORK PLANE
1st Period (12 months)
  • Drill one exploration well
  • Exploratory evaluation
  • Surface Geology
  • Magnetotelluric Outline
  • Seismic Interpretation
  • This first exploration phase is done
2nd Period (12 months)
  • Acquisition of 60 Km of 2D seismic
  • Re-interpretation of old 2D seismic information and integration of the results with the exploration well
3th Period (12 months)
  • Drill one exploration well
  • Preparation of the static & dynamic geological model
4th Period (12 months)
  • Drill one exploration well
  • Re-evaluation of the exploration period
5th Period (12 months)
  • Drill one exploration well
  • Re-evaluation of the exploration period
6th Period (12 months)
  • Drill one exploration well
  • Re-evaluation of the exploration period

 
Latest News
Opportunities



Gold Oil Plc has the following assets for which it is looking for partners:

Peru Offshore Block Z34 Prospect Summary May 2010

Download (352 KB)

Farmin Opportunity Block XXI May 2010
Download (2.4 MB)


 


 
Copyright 2009 - Gold Oil PLC – All rights reserved
 
Malecón 28 de Julio 455 Office 902, Miraflores 18, Lima - Perú +51(01)4442900 / Fax: +51(01)2419253.